Hello Babu,
Thanks for the reply but here are the details of what I am using:
In check control ATPgroup+BE=consider checking horizon and consider past receipt
I am not using any days in Chking hor GR
In the product master I am not using any days as well in the CH.
In the material master, nothing has been maintain in the TRLT or GR days etc.
I have also tested by putting days in the above fields but it still give me erroneous results ie 99999....qty.
However if I use No Checking Horizon, the system behaves properly and gives me the correct results.
So I fail to understand as if I use No checking horizon then system ideally should give me infinite qty for atp and it should be other way round if I use Consider Checking horizon.
Do let me know if my understanding is incorrect.
Thanks
Karan